Power Systems Engineering

Resourcing Plan & Tracker — Living document
Updated weekly  /  Source: poria-org-resourcing.xlsx

Engineers · This Month (May '26)

Poria Astero
VP, Power Systems Engineering
Idle
No active assignments
Madjer Santos
Director, Protection Engineering
Idle
No active assignments
Mehdi Rezvani
Director, Power Systems Studies
Idle
No active assignments
Ocean Islam
Power Systems Engineer
Idle
No active assignments
Iman Kaffashan
Senior Manager, Power Systems Studies
Idle
No active assignments
Bhavesh Shinde
Manager, Power Systems Studies
Idle
No active assignments

Schedule

Project / Month
May '26
Jun '26
Jul '26
Aug '26
Sep '26
Oct '26
Nov '26
Dec '26
Jan '27
Feb '27
Mar '27
Apr '27
May '27
Jun '27
Jul '27
Aug '27
Sep '27
Oct '27
Nov '27
Dec '27
AVR Retests (URGENT)19 plants
AVR Retests — Engie0/19 done · 19 remaindue May 14, 2026
plants / mo
19
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
PRC-029-1 Compliance38 plants
PRC-029 (SOLAR) — Engie0/7 done · 7 remaindue Oct 01, 2026
plants / mo
2
2
1
1
1
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
PRC-029 (WIND) — Engie0/8 done · 8 remaindue Oct 01, 2026
plants / mo
2
2
2
1
1
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
PRC-029 (BESS) — Engie0/4 done · 4 remaindue Oct 01, 2026
plants / mo
1
1
1
1
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
PRC-029 (SOLAR) — NextEra0/7 done · 7 remaindue Oct 01, 2026
plants / mo
2
2
1
1
1
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
PRC-029 (WIND) — NextEra0/9 done · 9 remaindue Oct 01, 2026
plants / mo
2
2
2
2
1
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
PRC-029 (BESS) — NextEra0/3 done · 3 remaindue Oct 01, 2026
plants / mo
1
1
1
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
NOGRR 255 / 2795 plants
NOGRR 255 bundle — Engie0/5 done · 5 remaindue Aug 01, 2028
plants / mo
1
1
1
1
1
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
PRC-028-15 plants
PRC-028-1 — Engie0/5 done · 5 remaindue Dec 31, 2027
plants / mo
1
1
1
1
1
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
MQT (Product)
MQT ERCOT/MISO
DOE MQT (CAISO/ISO-NE)
NERC Workflows & Dashboards
PRC 29 Workflow
NERC MOD Workflows
RFI dashboard and case classification
AVR dashboard workflow
OEM Models
OEM Model library: Relay and protection
OEM Model library: IBR OEM (Divide OEM between team member)
Platform & Pipelines
Case build pipeline: PSS/E (positive-sequence) → dynamics (PSS/E) → PSCAD → TSAT
QA framework for PSCAD simulations
Add GFM (grid-forming) modeling support
Add TSAT integration
Add PSLF integration
Dynamic Test Harness
MISO Project — MISO
Forward-Deployed / Ad-hoc
FD project from Engie — Engie

Project Detail

ProjectSectionClientSitesDoneDeadlineEng-MonthsCheckStatus
AVR Retests — EngieAVR Retests (URGENT)Engie0.0⚠ expected 3.8, allocated 0.0
PRC-029 (SOLAR) — EngiePRC-029-1 ComplianceEngie0.0⚠ expected 3.5, allocated 0.0
PRC-029 (WIND) — EngiePRC-029-1 ComplianceEngie0.0⚠ expected 4.0, allocated 0.0
PRC-029 (BESS) — EngiePRC-029-1 ComplianceEngie0.0⚠ expected 2.0, allocated 0.0
PRC-029 (SOLAR) — NextEraPRC-029-1 ComplianceNextEra0.0⚠ expected 3.5, allocated 0.0
PRC-029 (WIND) — NextEraPRC-029-1 ComplianceNextEra0.0⚠ expected 4.5, allocated 0.0
PRC-029 (BESS) — NextEraPRC-029-1 ComplianceNextEra0.0⚠ expected 1.5, allocated 0.0
NOGRR 255 bundle — EngieNOGRR 255 / 279Engie0.0⚠ expected 1.2, allocated 0.0
PRC-028-1 — EngiePRC-028-1Engie0.0⚠ expected 1.2, allocated 0.0
MQT ERCOT/MISOMQT (Product)0.0
DOE MQT (CAISO/ISO-NE)MQT (Product)0.0
PRC 29 WorkflowNERC Workflows & Dashboards0.0
NERC MOD WorkflowsNERC Workflows & Dashboards0.0
RFI dashboard and case classificationNERC Workflows & Dashboards0.0
AVR dashboard workflowNERC Workflows & Dashboards0.0
OEM Model library: Relay and protectionOEM Models0.0
OEM Model library: IBR OEM (Divide OEM between team member)OEM Models0.0
Case build pipeline: PSS/E (positive-sequence) → dynamics (PSS/E) → PSCAD → TSATPlatform & Pipelines0.0
QA framework for PSCAD simulationsPlatform & Pipelines0.0
Add GFM (grid-forming) modeling supportPlatform & Pipelines0.0
Add TSAT integrationPlatform & Pipelines0.0
Add PSLF integrationPlatform & Pipelines0.0
Dynamic Test HarnessPlatform & Pipelines0.0
MISO Project — MISOPlatform & PipelinesMISO0.0
FD project from Engie — EngieForward-Deployed / Ad-hocEngie0.0

Workstream Capacity

avr · 19 sites · rate 5.00
Expected: 3.8 eng-months. Allocated: 0.0 eng-months. GAP: 3.8 eng-months under
nogrr255 · 5 sites · rate 4.00
Expected: 1.2 eng-months. Allocated: 0.0 eng-months. GAP: 1.2 eng-months under
prc028 · 5 sites · rate 4.00
Expected: 1.2 eng-months. Allocated: 0.0 eng-months. GAP: 1.2 eng-months under
prc029 · 38 sites · rate 2.00
Expected: 19.0 eng-months. Allocated: 0.0 eng-months. GAP: 19.0 eng-months under

Allocation Editor

Ready
Poria Astero
Madjer Santos
Mehdi Rezvani
Ocean Islam
Iman Kaffashan
Bhavesh Shinde

Average Completion Rate

5.00sites/eng-month
AVR retest workflow — Poria to calibrate
2.00sites/eng-month
MQT workflow (future client work) — Poria to calibrate
4.00sites/eng-month
NOGRR 255/279 — Poria to calibrate
4.00sites/eng-month
PRC-028-1 — Poria to calibrate
2.00sites/eng-month
PRC-029-1 compliance — Poria to calibrate